• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Assignment 3 - 14148_154
Assignment 3-Cont. - 14148_156

Military Requirements for Senior and Master Chief Petty Officer
Page Navigation
  135    136    137    138    139  140  141    142    143    144    145  
3-11. What  priority  manning  category relates  to  ships  and  activities requiring increased manning for a specific  period  to  carry  out  a mission  that  is  essential  to national   interest? 1. Priority 1 2. Priority 2 3. Priority 3 4. Priority 4 3-12. What  priority  manning  category relates  to  ships  and  activities having  a  specific  need  for increased  manning  for  specific mission   accomplishment? 1. Priority 1 2. Priority 2 3 .   P r i o r i t y  3 4. Priority 4 3-13. When are priority 3 manning authorizations  canceled? 1. Upon  completion  of  the  mission 2.  When  the  manning  requirement has been met 3. On 31 March of each year 4. When new priority manning authorizations  are  required 3-14. The  priority  manning  system  is generally  limited  to  which  of  the following  components? 1. Whole   activities 2.  Whole  ratings  within  an a c t i v i ty 3. The whole specific NEC community in an activity 4. All  of  the  above 3-15. Each  Navy  activity  reviews  its manpower  requirements  and classifications  at  least  how  often? 1. Monthly 2.  Quarterly 3.  Semiannually 4.    Annually 3-16. Which  of  the  following  OPNAV instructions  contains  procedures for  requesting  Manpower Authorization  changes? 1. 1000/4A 2. 3220.32B 3. 1000.16G 4. 1600.12B 3-17. The  Navy  Manpower  Requirements Program  includes  which  of  the following  subsystems? 1. Ship Manpower Document and Squadron  Manpower  Document  only 2. Ship  Manpower  Document,  and shore  requirements,  standards, and  manpower  planning  system only 3.  Shore  requirements,  standards, and manpower planning system, and Squadron Manpower Document only 4. Ship Manpower Document, Squadron  Manpower  Document,  and shore  requirements,  standards, and  manpower  planning  system 3-18. The functions a command is expected to  perform  in  carrying  out  its assigned mission is known by which of  the  following  terms? 1. Projected  operational environment 2. Required  operational c a p a b i l i t i es 3.  Operational  commitments 4. Task loading 3-19. The  most  demanding  environment  in which a naval unit must operate and be  fully  manned  and  capable  of accomplishing  its  mission  is  known by which of the following terms? 1. Operational commitment 2. Required  operational  commitment 3. Projected  operational environment 4.  Employment  goal 17







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.